WaterBoost
WaterBoost WB-Coffin 320 Esybox Variable Speed 2206110
WaterBoost WB-Coffin 320 Esybox Variable Speed 2206110
Couldn't load pickup availability
The WaterBoost WB-Coffin 320 Esybox is a compact, variable-speed water boosting system engineered to overcome low water pressure or restricted flow in domestic and light commercial applications. Designed for installations where space is limited, it provides a cost-effective solution while still delivering exceptional reliability, performance, and build quality.
The system combines a durable 320-litre WRAS-approved coffin-style tank with the proven DAB Esybox booster pump, delivering efficient and consistent pressure boosting of up to 80 litres per minute at 3 bar. This makes it ideal for properties requiring enhanced performance across showers, taps, and appliances without the footprint or complexity of larger boosting systems.
With compact dimensions of 1650mm (L) × 610mm (W) × 500mm (H), the WB-Coffin 320 Esybox is perfectly suited to installations where height restrictions or limited access are key considerations, including garages, cupboards, and plant rooms.
For added convenience, the tank is supplied pre-fitted with a By-law 30 kit and ½" ball valve, and all interconnecting pipework is included as standard — ensuring installation is swift, clean, and straightforward. Energy-efficient operation is delivered through the Esybox's advanced variable-speed control, providing smooth, stable pressure while helping to minimise running costs. The tank carries a 5-year warranty and the DAB Esybox a 3-year warranty.
Share
